Download Print this page

Toyota Prius 2010 Repair Manual page 89

Hide thumbs Also See for Prius 2010:

Advertisement

INSPECTION PROCEDURE
PROCEDURE
1.
CHECK HARNESS AND CONNECTOR (POWER SOURCE CIRCUIT)
(a) Disconnect the A/C pressure sensor connector.
(b) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Tester Connection
Switch Condition
Specified Condition
A31-3 (+) - Body ground
Power switch on (IG)
4.75 to 5.25 V
2010 Toyota Prius
Repair Manual

Advertisement

loading