Download Print this page

Toyota Prius 2010 Repair Manual page 44

Hide thumbs Also See for Prius 2010:

Advertisement

OPERATION CHECK
1. OPERATION CHECK OF REMOTE AIR CONDITIONING SYSTEM
HINT:
The remote air conditioning system does not operate unless the required operating conditions are met.
Therefore, confirm that the operating conditions are met before performing the inspection
(a) Activation Control Check
(1) Press and hold the remote A/C switch on the key (electrical transmitter) once for 1 seconds or more to start
the air conditioning system.
HINT:
The wireless door lock system locks all doors before the remote air conditioning system is activated.
(b) Operation Check
(1) Check that the remote air conditioning system operates for a maximum of 3 minutes.
HINT:
The operating time differs depending on the HV battery state of charge.
(c) Stop Control Check
(1) Press the remote A/C switch on the key (electrical transmitter) twice briefly within 3 seconds to stop the
remote air conditioning system.
HINT:
When any of the operating conditions are not met during remote air conditioning system operation, the
remote air conditioning system will stop.
When 3 minutes have elapsed after the remote air conditioning system was started, the remote air
conditioning system will stop. Some operating conditions may result in the remote air conditioning
system being stopped before 3 minutes elapses.
(d) Operation Check of the Remote A/C Switch on the Key (Electrical Transmitter)
NOTICE:
Use 2 keys (electrical transmitters).
Confirm that the wireless door lock functions operate normally.
2010 Toyota Prius
(1) Prepare 2 registered keys (electrical transmitters), and label one of
them key (electrical transmitter) A, and the other key (electrical
transmitter) B.
.
Repair Manual

Advertisement

loading