Installing the Fiber Remote Multi-IPE Interface unit
The Fiber Remote Multi-IPE Interface unit can be installed onto a wall or
into a rack-mounted shelf that accommodates up to six Fiber Remote
Multi-IPE Interface units. These units must be installed within 30 feet
from the Remote IPE and no further than 25 feet from the power source,
because the cables connecting the Fiber Remote Multi-IPE Interface units
to the local equipment are 30 feet long and the power cable is 25 feet long.
In some instances, a remote site may have multiple Fiber Remote
Multi-IPE Interface units, which can be installed into the rack-mounted
shelf. To perform this installation, refer to
Multi-IPE Interface units into the shelf" (page
Installing the unit onto the wall
Two slotted holes are provided at the back of the Fiber Remote Multi-IPE
Interface unit enclosure to mount the Fiber Remote Multi-IPE Interface unit
on the wall such that the faceplate is located on the left-hand side and the
I/O panel at the right-hand side of the unit.
To mount the Fiber Remote Multi-IPE Interface unit on the wall, refer to
Figure 9 "Wall-mounting the Fiber Remote Multi-IPE Interface unit" (page
60)
Multi-IPE Interface unit on the wall" (page
Procedure 21
Mounting the Fiber Remote Multi-IPE Interface unit on the wall
Step
1
2
3
4
Copyright © 2007-2009 Nortel Networks
.
and follow the steps in
Action
Find a location on the wall to give the Fiber Remote Multi-IPE
Interface unit enough clearance to install the fiber-optic cables in
the front and superloop cables in the back of the unit.
Allow for a minimum of six inches of clearance in the front for the
fiber-optic cables. Provide a minimum of 13 inches of clearance
at the back.
Position the wall mount template on the wall and use a level
to ensure horizontal positioning of the Fiber Remote Multi-IPE
Interface unit.
Mark the three screw holes and the two alignment marks.
Drill the screw holes.
Screw two number 8 screws into the wall board or plywood.
The screw heads should be 1/16 inch away from the wall surface
to allow insertion of the screw heads into the slotted holes on the
bottom of the Fiber Remote Multi-IPE Interface unit as shown in
Figure 9 "Wall-mounting the Fiber Remote Multi-IPE Interface
unit" (page
60).
Nortel Communication Server 1000
Fiber Remote Multi-IPE Interface Fundamentals
NN43021-556 03.01
11 May 2009
"Installing multiple Fiber Remote
57).
Procedure 21 "Mounting the Fiber Remote
81).
Remote IPE installation 81

Advertisement

Table of Contents
loading

This manual is also suitable for:

Communication server 1000e cp piiCommunication server 1000e cp pivCommunication server 1000e cp pmCommunication server 1000m single group cp piiCommunication server 1000m single group cp pivCommunication server 1000m multi group cp pii ... Show all

Table of Contents