15. Load Test with Impedance Probe (LOAD TEST 001)
Required Equipment
Impedance Probe Kit
E4916A Opt.001
Procedure
1. Connect the equipment as shown in Figure 2-17.
Figure 2-17. Setup for Load Test with Impedance Probe
2. Select \LOAD TEST 001" and click
NNNNNNNN
OK in the list box of the program display.
3. Following the program instructions, complete the procedure.
2-24 Adjustments and Performance Tests