Post Repair Procedures - Agilent Technologies E4915A Service Manual

Crystal impedance / lcr meter
Table of Contents

Advertisement

Post Repair Procedures

Introduction
The Table 7-1 lists the procedures which must be performed after the replacement of an
assembly. When you replace an assembly, con rm the Board Con guration and perform the
Adjustments/Performance Tests following Table 7-1.
Replaced
Board
Assembly
Con g.
1
A1 Main
Yes
See Board Con guration .
1
For the E4916A with Option 001 only.
2
Table 7-1. Post Repair Procedures
Required Adjustments/
Performance Tests
Firmware Installation (INSTALL FW)
ID Writing (WRITE ID)
All adjustments/performance tests:
Pre-check and Source Linearity Calibration
Oscillator Calibration
Source Level Accuracy and Source Power Linearity Test
Frequency Accuracy Test
Trough Calibration
Receiver Test
Isolation Test
Open Calibration with PI-network Test Fixture
Short Calibration with PI-network Test Fixture
Load Calibration with PI-network Test Fixture
Load Test with PI-network Test Fixture
Open Calibration with Impedance Probe
Short Calibration with Impedance Probe
Load Calibration with Impedance Probe
Load Test with Impedance Probe
2
2
2
2

Post Repair Procedures 7-1

7
Other
Veri cation
Self Test

Advertisement

Table of Contents
loading

This manual is also suitable for:

E4916a

Table of Contents