Canon iPR C7010VP Series Installation Manual page 142

Table of Contents

Advertisement

3) Remove the upper guide plate [1].
- 4 screws [2]
CAUTION:
Do not touch the upper guide plate with bare hand.
[2]
[1]
[2]
F-2-403
4) Remove the harness guide [1].
- 1 screw [2]
5) Remove the harness guide [3].
- 2 screws [4]
[3]
[4]
F-2-404
6) Remove the 3 motor mounts [1] and the 3 timing belts [2].
- 2 screws each [3]
[3]
[1]
[3]
[2]
F-2-405
CAUTION: Point to note when attaching
Attach the timing belts [1] to cover the motor pulleys [2], the pulleys [3] and
the tensioner rollers [4] uniformly.
[3]
[4]
[2]
[1]
[2]
[4]
[2]
[1]
[2]
[3]
[2]
[1]
[3]
[1]
[1]
[1]
[3]
[4]
[3]
[2]
[4]
7) Remove the bearing [1] on the rear side.
- 1 E ring [2]
- 1 pulley [3]
- 1 dowel pin [4]
[4]
[3]
[2]
F-2-406
8) Remove the bearing [1] on the front side, and then remove the lower ver-
tical path roller 3 [2].
- 1 screw [3]
- 1 grounding plate [4]
- 1 sintered bushing [5]
- 1 E ring [6]
[1]
[6]
[5]
[2]
F-2-407
CAUTION:
When replacing, be sure to apply grease around the inner diameter of the
bearing.
(Super lube grease)
CAUTION: Point to note when attaching
- Do not touch the 2 rubber rollers with bare hand.
- Attach the roller with the slot [2] facing to the front side.
Chapter 2
[1]
[3]
[4]
2-97

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ipr c7010vps series

Table of Contents