Use the following procedure to unpack the system cabinet:
1.
Position the carton so that the front faces an open space with enough
clearance to allow the cabinet to be rolled down ramps.
2.
Using a utility knife, cut the shipping straps from the carton.
3.
Remove the outside top cardboard cover.
4.
Remove the outside shipping box. This is typically done by using a
7/16" socket wrench to remove two bolts that hold the box together.
5.
Remove the inside top cardboard cover.
6.
Remove the protective plastic wrapping by slipping it up and over the
cabinet.
7.
Locate the box that contains the ramp kit and open it (see Figure 2-2).
NOTE: It's a good idea to save all packing materials intact in case the sys-
tem needs to be shipped in the future.
Table 2-2 Shipping Dimensions and Weights
Height
Cabinet
cm (in)
195 (76.8)
System
195 (76.8)
Expander
1 Weights are based on a fully configured cabinet.
2 For systems with battery backup add 29 kg (64 lbs) per power supply.
Width
Depth
cm (in)
cm (in)
91.4 (36.0)
122 (47.9)
91.4 (36.0)
122 (47.9)
Installing the System Cabinet 2-7
Weight
1
kg (lbs)
309–626
2
(680–1380)
309–626
2
(680–1380)

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AlphaServer 8200 and is the answer not in the manual?

Questions and answers

Table of Contents