Collect Tools And Resources - DEC AlphaServer 8200 Installation Manual

Hide thumbs Also See for AlphaServer 8200:
Table of Contents

Advertisement

2.2 Collect Tools and Resources

You will need the items listed in Table 2-1 to unpack and install
the system cabinet. The removal of the cabinet from the pallet re-
quires at least two people.
Table 2-1 Tools and Resources
Item
Use
To verify that all hardware has been delivered
Product Delivery
Document and
packing slip
To remove straps from cabinet shipping boxes
Utility knife
To remove pallet brackets and to adjust leveler feet
Adjustable
wrench
To verify that the cabinet is properly leveled
Level
Socket wrench set
To remove and install bolts
To check AC and DC voltages
Digital voltmeter
Work space for unpacking and installation
Table or bench
Flathead screw-
For installation of I/O port module cable(s)
driver
2-4 Installing the System Cabinet

Advertisement

Table of Contents
loading

Table of Contents