Installing A Power Synchronized Unit - Fujitsu ETERNUS AF Series Configuration Manual

All-flash arrays, hybrid storage systems, disk storage systems, power synchronized unit
Hide thumbs Also See for ETERNUS AF Series:
Table of Contents

Advertisement

2.
Installation
Installing in a Rack

Installing a Power Synchronized Unit

This section describes how to install a power synchronized unit in a rack.
■ Checking the package contents of the rack mount kit
Check the following package contents to confirm that there are no missing parts. If there are missing parts, con-
tact your sales representative.
❏ L-shaped bracket: 2
Same for right and left.
❏ M6 cross recessed head screw
with captive washer: 4
■ Procedure for installing a power synchronized unit
Procedure
1
Open the front and rear doors of the rack.
2
Attach the M6 cage nuts to the rear rack pillar.
Attachment positions
Insert four M6 cage nuts in the 1st and 3rd holes above the power synchronized unit base line.
FUJITSU Storage ETERNUS AF, ETERNUS DX Configuration Guide (Power Synchronized Unit)
❏ M3 flat head screw: 4
For attaching L-shaped brack-
ets
❏ Blank panel: 1
(Rear rack pillars)
3rd position
1st position
Base line of
power synchronized unit
Copyright 2019 FUJITSU LIMITED
1U (power synchronized unit size)
35
❏ M6 cage nut: 4
Used when the holes in the rack
pillars are square
P3AM-8012-14ENZ0

Advertisement

Table of Contents
loading

Table of Contents