Connecting The Ac Sensor Unit - Fujitsu ETERNUS AF Series Configuration Manual

All-flash arrays, hybrid storage systems, disk storage systems, power synchronized unit
Hide thumbs Also See for ETERNUS AF Series:
Table of Contents

Advertisement

4.
Connection and Settings
Connecting to the Server UPS Unit
1-2
Attach the release ties to the plugs of the power cords (for AC sensor) to firmly fix the power plugs to
ensure they do not become unplugged.
2
Connect the plugs at the other ends to the server UPS units.
Connect the plugs of the power cords (for AC sensor) at the other ends to the output outlets of the server
UPS units.

Connecting the AC Sensor Unit

To use the AC sensor unit, connect the server UPS unit and the AC sensor unit with the power cord (for AC sensor),
and connect the AC sensor unit and the power synchronized unit with the AC sensor port connection cable.
One AC sensor port connection cable (4m) is provided with each AC sensor unit.
Each AC sensor unit requires a power cord (for AC sensor) that must be obtained by customers.
Procedure
1
Connect the AC sensor unit and the server UPS unit with the power cord (for AC sensor).
1-1
Connect the plug of the power cord (for AC sensor) to the AC In port on the AC sensor unit.
1-2
Connect the plug at the other end of the power cord (for AC sensor) to the outlet of the server UPS unit.
FUJITSU Storage ETERNUS AF, ETERNUS DX Configuration Guide (Power Synchronized Unit)
Release ties
Power cord (for AC sensor)
AC In port
Copyright 2019 FUJITSU LIMITED
55
End of procedure
P3AM-8012-14ENZ0