Operation And Maintenance; Checking The Power Synchronized Unit Status; Device Replacement After Operation Startup; Replacing A Server - Fujitsu ETERNUS AF Series Configuration Manual

All-flash arrays, hybrid storage systems, disk storage systems, power synchronized unit
Hide thumbs Also See for ETERNUS AF Series:
Table of Contents

Advertisement

6.

Operation and Maintenance

This chapter describes maintenance and troubleshooting after starting system operation.

Checking the Power Synchronized Unit Status

Check the LEDs on the power synchronized unit regularly.

Device Replacement After Operation Startup

This section explains the procedure to replace devices after starting system operation.

Replacing a Server

Replacing a Power Synchronized Unit
Replacing an AC Sensor Unit
CAUTION
Replacing a Server
The following procedure provides an overview of the required work to replace a server, such as when a server fails.
Refer to the relevant manuals for more details.
Procedure
1
Replace the server.
2
Perform the necessary settings for the replacement server.
3
Connect the replacement server to the server UPS unit.
After the procedure is complete, check that power synchronization performs normally if necessary.
FUJITSU Storage ETERNUS AF, ETERNUS DX Configuration Guide (Power Synchronized Unit)
Do
Ask your maintenance engineer to replace devices.
68
Copyright 2019 FUJITSU LIMITED
End of procedure
P3AM-8012-14ENZ0

Advertisement

Table of Contents
loading

Table of Contents