5.
Adding a Connecting Device
Connection Procedure When Adding a Server
UPS unit for
Server#1
UPS unit for
Server#0
Power synchronized unit
AC SENSOR port
UPS unit for
Server#2
UPS unit for
Server#3
After the procedure is complete, check that power synchronization performs normally if necessary.
FUJITSU Storage ETERNUS AF, ETERNUS DX Configuration Guide (Power Synchronized Unit)
Server#1
Server#0
AC sensor unit
Added server
Server#2
Added server
Server#3
63
Copyright 2019 FUJITSU LIMITED
AC sensor port connection cable
(provided with an AC sensor unit)
Branch connector
AC In port
Power cord (for AC sensor)
(Must be obtained by customers)
End of procedure
P3AM-8012-14ENZ0