Smart Pcs Installation Check - Huawei LUNA2000-200KWH-2H1 Smart String ESS User Manual

Hide thumbs Also See for LUNA2000-200KWH-2H1 Smart String ESS:
Table of Contents

Advertisement

LUNA2000-200KWH-2H1 Smart String ESS
User Manual
No.
7
8
9
10

9.1.3 Smart PCS Installation Check

Refer to the
Check
Item
Install
ation
Electric
al
connec
tion
Others
Issue 02 (2023-02-28)
Check Item
Baffle plate for the
power distribution
area
SPD
Subcomponent
(CMU, adapter, and
rack mounted fire
extinguishing
system)
Grounding
LUNA2000-100KTL-M1 Smart Power Control System User Manual .
Expected Result
The Smart PCS is not deformed or damaged.
The bottom is securely fixed.
The Smart PCS is properly installed.
The clearance around the Smart PCS meets requirements.
Check that the upstream DC switch and downstream AC switch are
OFF.
All cables are intact and free from any damage or cracks.
All ground cables are connected securely and reliably.
All AC power cables are connected correctly and securely, and there is
no open circuit or short circuit.
All DC cables are connected securely in correct polarity, and there is no
open circuit or short circuit.
The communications cables are connected correctly and securely.
The AC maintenance compartment is clean and tidy, without foreign
matter.
The DC maintenance compartment is clean and tidy, without foreign
matter.
Copyright © Huawei Digital Power Technologies Co., Ltd.
Expected Result
The baffle plates in the power
distribution area are free from cracks,
dents, scratches, and looseness.
The SPD indicator is green.
All components are intact.
The ground conductor is reliably
connected to the ground terminal board
or copper bar of the container.