LUNA2000-200KWH-2H1 Smart String ESS
User Manual
Check
Item

9.1.4 SACU Installation Check

For details, see the
No PID
No.
1
2
3
4
5
6
7
8

9.2 Installing the PSU

Prerequisites
PSUs are secured inside the ESS during transport and installed onsite.
Issue 02 (2023-02-28)
Expected Result
The AC maintenance compartment door is closed and the screws on
the door are tightened.
The DC maintenance compartment door is closed and the screws on
the door are tightened.
The waterproof plugs on the unused USB and COM ports are secured.
SmartACU2000D Smart Array Controller User Manual (with
Module).
Expected Result
The cabinet and all components are installed properly.
All upstream switches for the cabinet and all switches inside the
cabinet are OFF.
All cables are connected correctly and securely, without exposed
metal.
Cables are bound neatly, and cable ties are secured evenly and
properly in the same direction.
Routing for the power cables and signal cables meets the
requirements for routing electrical and extra low voltage (ELV) cables
and complies with the cable routing plan.
The locking caps of the used waterproof connectors are tightened and
sealed. Idle waterproof connectors are plugged and the locking caps
are tightened.
The cabinet interior is clean, without dust, dirt, or foreign matter.
The paint on the cabinet exterior is intact. Immediately repaint the
part where paint has fallen off to prevent corrosion.
Copyright © Huawei Digital Power Technologies Co., Ltd.
9 System Power-On