7.4.3 Installing the Smart Rack Controller

Prerequisites
Unpack and check the rack controller delivered to the site to ensure that it is
intact.
Procedure
Step 1 Remove the decorative cover and maintenance compartment cover from the rack
controller.
Figure 7-23 Removing covers
Step 2 Install short-circuiting copper bars that are delivered with the product.
Figure 7-24 Installing short-circuiting copper bars
Step 3 Install the maintenance compartment cover and the decorative cover to the rack
controller.