Forklift Requirements; Hoisting Requirements - Huawei LUNA2000-200KWH-2H1 Smart String ESS User Manual

Hide thumbs Also See for LUNA2000-200KWH-2H1 Smart String ESS:
Table of Contents

Advertisement

LUNA2000-200KWH-2H1 Smart String ESS
User Manual

5.4 Forklift Requirements

5.5 Hoisting Requirements

Stage
Before hoisting
Issue 02 (2023-02-28)
The error of the elevation of the top surface of the foundation (column)
should be less than or equal to 3 mm. It is recommended that the foundation
be 300 mm higher than the horizontal ground.
Ensure that the bottom of the equipment is higher than the local highest
water level to prevent rain from eroding the ESS base and interior.
A drainage system must be constructed onsite to prevent the bottom or
internal devices of the ESS from being immersed in water in rainy seasons or
when a large amount of precipitation occurs.
Reserve trenches or cable inlets for the ESS during foundation construction.
The reserved holes on the foundation and the cable inlets at the bottom of
the equipment should be sealed.
The following foundation drawing is for reference only and cannot be used as
the final construction drawing. The design specifications of the ESS
foundation should be reviewed based on the installation environment,
geological features, and seismic resistant requirements of the project site.
Do not move the ESS after battery packs are installed.
Before using a forklift, ensure that the forklift has a load bearing capacity of
at least 1 t.
It is recommended that the length of the tynes be greater than or equal to
1.2 m, the width be 80 cm to 160 cm, and the thickness be 25 cm to 70 cm.
Before hoisting, ensure that the crane and hoisting ropes meet the load-
bearing requirements.
When installing or removing the hoisting equipment, do not drag it on the
container to prevent scratches.
Do not hoist or move the ESS after battery packs are installed.
Precautions
Crane hoisting capacity > 1 t, working radius ≥ 2 m If the
onsite environment does not meet the required working
conditions, ask a professional to assess the conditions.
Only trained and qualified personnel are allowed to perform
hoisting operations.
Check that hoisting tools are complete and in good
condition.
Ensure that the hoisting tools are secured to a load-bearing
object or wall.
The weather condition should be good without wind when
the unit needs to be hoisted outdoors.
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Site Requirements
69

Advertisement

Table of Contents
loading

Table of Contents