System Power-On; Check Before Power-On; General Check - Huawei LUNA2000-200KWH-2H1 Smart String ESS User Manual

Hide thumbs Also See for LUNA2000-200KWH-2H1 Smart String ESS:
Table of Contents

Advertisement

LUNA2000-200KWH-2H1 Smart String ESS
User Manual

9.1 Check Before Power-On

9.1.1 General Check

No.
1
2
3
4
5
Issue 02 (2023-02-28)
Check Item
Expected Result
Appearance
● The equipment is intact and free from rust or paint
● The labels on the device are clear. Damaged labels
Cable
● Cable sheathings are properly wrapped and not
appearance
● Cable hoses are intact.
Cable
● Cables are connected in the designed positions.
connections
● Terminals are prepared as required and securely
● Labels on both ends of each cable are clear and
Cable
● Electrical and ELV cables are routed separately.
routing
● Cables are neat and tidy.
● Cable tie joints are evenly cut without burrs.
● Cables are placed properly and with slack at bending
● Cables are routed neatly without twists or crossovers
Battery pack
The copper bar is not deformed, and the plastic dip
copper bar
coating is not damaged.
Copyright © Huawei Digital Power Technologies Co., Ltd.
9

System Power-On

flake-off. If paint flakes off, repaint the equipment.
must be replaced.
damaged.
connected.
specific, and attached in the same direction.
points to avoid stress.
in the cabinets.
9 System Power-On
116

Advertisement

Table of Contents
loading

Table of Contents