NetCol8000-A013 In-room Air Cooled Smart Cooling
Product
User Manual (800 mm Width)
Step 5 Install the new fan drive board in reverse order.
Step 6 After power-on, tap
confirmation screen. Ensure that the smart cooling product is running properly
without any alarms.
----End
5.4.1.8 Replacing the LCD
Prerequisites
●
●
●
Context
Tool: Phillips screwdriver
Procedure
Step 1 Open the front door.
Step 2 Remove the cables from the LCD.
Step 3 Use a Phillips screwdriver to remove the four screws from the rear of the LCD.
Step 4 Remove the LCD and backplane.
Step 5 Install the new LCD and backplane in reverse order.
Step 6 Install the LCD cables.
Step 7 Choose Maintenance > USB Wizard > Configuration Import to import historical
data.
Step 8 After the cables are reconnected, the home screen is displayed on the LCD. Check
whether the display is normal.
----End
5.4.1.9 Replacing an EEV
Issue 06 (2022-11-25)
The LCD needs to be replaced.
A spare LCD with the correct software version is available.
Choose Maintenance > USB Wizard > One-Click Export to export historical
data to a USB flash drive.
NO TE
1. The USB port of the USB flash drive must comply with the USB2.0 standard.
2. The FAT32 USB flash drive (4, 8, 16, or 32 GB) should be used.
3. The upgrade file must be stored in the root directory of the USB flash drive.
Copyright © Huawei Technologies Co., Ltd.
5 System Operation and Maintenance
on the home screen, and tap Yes on the start
118