SOFTENER INSTALLATION AND USER GUIDE 
 
1) INSTALLATION 
Pre‐installation instructions 
The cycle times, sequence of cycles, salt dose refill time and exchange capacity are preset to default by 
Excalibur. Installer must program the valve to recommended hardness, Day override and time of 
regeneration. Set time of day, read normal operating displays, read power loss and error displays if any. 
 
WATER 
TEST 
Hardness 
 
 
Iron     
 
 
pH  
 
 
 
*Nitrates   
 
 
Manganese    
 
Sulphur  
 
 
Total Dissolved  Solids   
 
 
 
General Installation and Service Warnings 
The softener is designed so that it can be installed easily with minor plumbing changes on 
previous plumbing. 
The piping must be clamped properly and the weight of the plumbing must not be on the 
softener. 
Do not use any kind of lubricant including silicone. A silicone based lubricant can be only used on 
O‐Rings but not necessary. 
The nuts and caps can be fastened and unfastened by hand or the plastic service wrench. Do not 
use pipe wrench to tighten the caps and nuts. 
 
 
Site Requirements 
Water Pressure: ‐ 40‐110 psi 
Water Temperature: ‐ 40‐110°F (4.4‐43°C) 
Electrical‐ 115/120 V, 60Hz Uninterrupted Outlet 
Current required is 0.5 Amperes 
The plug‐in transformer is for dry locations only 
The tank should be on a firm level surface 
BARRIE • ONTARIO • CANADA TF: 705.733.8900 WWW.EXCALIBURWATER.COM 
 
 
 
 
gpg 
 
 
 
ppm 
 
 
 
number 
 
 
 
ppm 
 
 
 
ppm 
 
 
 
yes/no 
 
 
 
 

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Progressive Flow SC1 Series and is the answer not in the manual?

Questions and answers

Table of Contents