Inverter Restart - Redback SH5000 Installation Manual

Smart hybrid system, inverter, battery enclosure
Hide thumbs Also See for SH5000:
Table of Contents

Advertisement

Operatio n
4.4

Inverter restart

Occasionally, it may be necessary to cold boot the inverter, to restart all software. A restart briefly interrupts all inverter
functions, noting that PV, battery, and grid supplies remain energised to the isolators.
STEP PROCEDURE
1.
Open the BoS switchgear hatch.
Switch the INVERTER AC isolator OFF (down).
2.
Switch the BACKUP AC isolator OFF (down).
3.
Turn the PV ARRAY DC isolator OFF (anticlockwise to 9 o'clock).
4.
Switch the BATTERY SYSTEM DC isolator OFF (down).
5.
Turn the Solar Supply Main Switch OFF (on the main switchboard
or sub-board).
Wait 10 seconds.
To restart the system:
1-5.
Working left to right, turn the BoS isolators and switches ON as
shown.
6.
Turn the Solar Supply Main Switch ON.
7.
The inverter will resume normal operation in about 2 minutes,
indicated by:
INVERTER STATUS PANEL LEDS
SYSTEM
COMMUNICATIONS
SYSTEM ERROR
OTHER LEDs:
EMS LEDS
POWER
HEARTBEAT
INVERTER
BATTERY
NETWORK
BLUETOOTH
46
Installation Manual - Redback Smart Hybrid System - v2.0
Green; ON
Yellow; ON
OFF
Varies with configuration
Green; ON
Red; FLASHING
Blue; ON
Blue; ON (if batteries are
connected)
Blue; ON (if Network OK)
Blue; FLASHING (for extra 30
minutes, then OFF)