Preliminary Electrical Installation - Redback SH5000 Installation Manual

Smart hybrid system, inverter, battery enclosure
Hide thumbs Also See for SH5000:
Table of Contents

Advertisement

2.3

Preliminary electrical installation

The Inverter and Balance of System (BoS) are hung on the Wall Mounting Frame.
When hung, the BoS and Inverter restrict access to the internal conduit space.
It may be faster (but not essential) to run cables and conduits before hanging
the BoS or inverter. Ensure that the cable tails have generous bend radii, are
long enough to reach the BoS and form effective drip loops.
The Wall Mounting Frame has numerous pass-throughs to accommodate rigid or
φ
flexible conduit up to
25mm. Do not use the lower pass-throughs as this will
affect future battery enclosure installation. Typical conduit routing is shown at
right.
Cables that can be run in advance include:
Solar array output
Grid connection to main or sub-board, using 2-core + earth (Flat,
TPS-cable or Orange Circular cable preferred)
Cable to Backup Circuit isolator (2-core + earth)
Communications cable (to energy meter)
Ethernet cable (to home network router)
All connections between inverter, BoS and batteries are internal, using supplied
cables.
#
1.
2.
3.
4.
5.
Installation Manual - Redback Smart Hy brid System - v2.0
Redback Technolo gies
PART NAME
Wall Mounting Frame
Inverter Front Cover
BoS Front Cover
Cables
Conduits
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Be14000

Table of Contents