Installation
2.6
Inverter electrical connections
2.6.1
OVERVIEW
All connections to the BoS/Inverter are through dedicated sockets or glands in the BoS, as shown.
#
CONNECTOR
1
Ethernet (to Home network)
2
Energy Meter (kWh Meter)
3
DRED
4
BMS
5
Battery Connector +ve
6
Battery Connector -ve
7
PV1 Connector +ve
8
PV1 Connector -ve
*Bungs are pre-fitted to Backup and Earth cable glands, to exclude water and insects. Remove as required.
22
Installation Manual - Redback Smart Hybrid System - v2.0
#
CONNECTOR
9
PV2 Connector +ve
10
PV2 Connector -ve
11
Relays Cable Gland #1
12
Backup Circuit Cable Gland*
13
Utility Grid Supply Cable Gland
14
Battery Cabinet Earth Cable Gland*
15
Relays Cable Gland #2