Tools And Equipment; Measuring And Marking Tools; Drills; Fastening Tools - H3C CR16000-M Installation Manual

Hide thumbs Also See for CR16000-M:
Table of Contents

Advertisement

NOTE:
A switching fabric module is provided with a protection box. To install the switching fabric module,
first remove the protection box.
• For a protection box that encloses the entire switching fabric module, loosen the captive screws
on the box, open the ejector levers of switching fabric module, and then pull the module out.
• For a protection box that encloses the rear half of the switching fabric module, loosen the captive
screws on the box and then remove the protection box from the switching fabric module.

Tools and equipment

No installation tools and equipment are provided with the router. Prepare installation tools and
equipment yourself as required. The following tools and equipment are for your reference.

Measuring and marking tools

Figure2-5
lists the measuring and marking tools that you might use during installation.
Figure2-5 Measuring and marking tools

Drills

Figure2-6
lists the drills that you might use during installation.
Figure2-6 Drills

Fastening tools

Figure2-7
lists the fastening tools that you might use during installation.
2-8

Advertisement

Table of Contents
loading

Table of Contents