Installation Tools; Installation Accessories; Pre-Installation Checklist - H3C RA5300 Installation Manual

Hide thumbs Also See for RA5300:
Table of Contents

Advertisement

Installation tools

No installation tools are provided with the router. Prepare them yourself as required.
Figure1-2 Installation tools

Installation accessories

Figure1-3 Installation accessories

Pre-installation checklist

Table1-4 Pre-installation checklist
Item
Installation site
Requirements
Ventilation
A minimum clearance of 100 mm (3.94 in) is
reserved around the air inlet and outlet vents.
The installation site has a good ventilation
system.
1-5
Result

Advertisement

Table of Contents
loading

Table of Contents