T10FM
4.4 Preparing for the rotor mounting
IMPORTANT
The rotor is very heavy (depending on measuring range: 26 kg ... 60 kg)!
Use a crane or other suitable lifting equipment to lift it out of its
packaging and install it.
Two eye bolts are screwed into the rotor as transport and mounting aids.
Hook the lifting equipment to these eye bolts as this ensures that the rotor is
lifted horizontally out of the packaging (see Fig. 4.1).
IMPORTANT
Transport and mounting eye bolts must be removed after mounting is
complete! Keep them safe for later use.
Transport and mounting eye bolts
Fig. 4.1: Transport and mounting eye bolts on the rotor
A0894-5.2 en
15
HBM