Mechanical installation

4
Mechanical installation
4.1

Important precautions during installation

S Handle the transducer with care.
S Welding currents must not be allowed to flow over the transducer. If there is
a risk that this might happen, you must provide a suitable low‐ohm
connection to electrically bypass the transducer. HBM provides the highly
flexible EEK ground cable for this purpose, for example, that is screwed on
above and below the transducer.
S Make sure that the transducer cannot be overloaded.
WARNING
There is a danger of the transducer breaking if it is overloaded. This can cause
danger for the operating personnel of the system in which the transducer is
installed.
Implement appropriate safety measures to avoid overloads or to protect
against the resulting dangers.
Notice
Load cells are precision measuring elements and need to be handled carefully.
Dropping or knocking the transducer may cause permanent damage. Make
sure that the transducer cannot be overloaded, including while it is being
mounted.
4.2

Mounting

Attach the load cells at the mounting holes and apply load to the other end.
The screws and tightening torques to be used are given in the following table:
10
A03578_02_Y00_00 HBM: public
PW29P