Figure 7-4 Turning on a switch
After the UPS is powered on, initialization begins. The MDU displays the
initialization progress bar.
----End

7.6.2.2 Initial Startup

● If the UPS is powered on for the first time, you need to obtain the startup
● The Service Expert app can be downloaded from HUAWEI AppGallery and can
Prerequisites
The Service Expert app has been installed and registered.
Procedure
Step 1 Obtain the service authorization code.
Issue 02 (2022-07-18)
NO TE
Switches share one handle. Take out the handle when you operate different switches and
reinstall it after the operations are complete.
NO TICE
password from the Service Expert app. Skip this step if the UPS is not powered
on for the first time.
only run on Android.
Copyright © Huawei Digital Power Technologies Co., Ltd.