Page 1
FusionPower6000 Maintenance Guide Issue Date 2022-07-18 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
About This Document About This Document Purpose This document describes the routine maintenance, troubleshooting, parts replacement, and FAQs of the FusionPower6000, helping readers understand how to maintain the FusionPower6000. Figures provided in this document are for reference only. Intended Audience This document is intended for: ●...
Page 7
7.9.2.2 Adding an ATS................................111 7.9.2.3 Adding a Compensation Cabinet........................... 112 7.9.3 Setting a Compensation Cabinet SPD Fault Alarm..................... 114 7.9.4 Creating a FusionPower6000 Plan View......................... 114 7.9.5 Exporting Data................................. 115 7.9.6 Exporting and Importing a Configuration File...................... 116 7.10 Setting the S-ECO Mode for a UPS..........................117 7.11 Transferring a UPS to Bypass Mode Manually.......................120...
Indoor dust removal refers to cleaning the floor and cleaning up foreign matter such as dust, sand, and cobwebs indoors. Perform an indoor dust removal once a week in the place where the FusionPower6000 is installed. ● During indoor dust removal, do not touch energized devices or facilities. Keep a safe distance from them.
Page 38
● Maintenance personnel must be qualified and use proper tools and testing devices. ● Before troubleshooting, turn off the input switch of the FusionPower6000 and attach a warning sign to prevent the equipment from being powered on again by accident.
Select a desired device in the Devices list, click Delete, and add the new device to the FusionPower6000 view. Edit the plan view and add devices. Choose Monitoring > Smart ETH Gateway > Running Parameters and set Device name for the new device to the device name before the replacement.
Page 56
Select a desired device in the Devices list, click Delete, and add the new device to the FusionPower6000 view. Edit the plan view and add devices. Choose Monitoring > Power Distribution > Running Parameters, set Device name for...
Page 58
Select a desired device in the Devices list, click Delete, and add the new device to the FusionPower6000 view. Edit the plan view and add devices. Choose Monitoring > Power Distribution > Running Parameters, set Device name for...
, and t are tripping time. ● The settings are factory defaults for the ACBs in the FusionPower6000. ● ACB parameters can be adjusted based on customer requirements. Step 8 Set the ACB to the normal running status before the replacement.
Page 71
Backlighting duration duration ● The settings are factory defaults for the ATS in the FusionPower6000. ● ATS parameters can be adjusted based on customer requirements. Step 9 Check that the Auto indicator on the ATS is steady on and that the switch is in the Auto position.
If the FusionPower6000 will not be used temporarily, perform the following steps to power it off. ● If the FusionPower6000 has been put into use and the customer's loads have been powered on, first obtain written consent from the customer. Otherwise, do not power off the FusionPower6000.
● If the UPS is powered on for the first time, you need to obtain the startup password from the Service Expert app. Skip this step if the UPS is not powered on for the first time. ● The Service Expert app can be downloaded from HUAWEI AppGallery and can only run on Android. Prerequisites The Service Expert app has been installed and registered.
● If the UPS is powered on for the first time, you need to obtain the startup password from the Service Expert app. Skip this step if the UPS is not powered on for the first time. ● The Service Expert app can be downloaded from HUAWEI AppGallery and can only run on Android. Prerequisites The Service Expert app has been installed and registered.
NO TE The configuration wizard is displayed after you log in for the first time, skip cloud service access, or change the system type to FusionPower6000. Step 3 Configure related parameters on the page as instructed. For details, see the function description on the left of the page.
Maintenance Guide 7 FAQ NO TE Ensure that Detail model is correctly set. Otherwise, the FusionPower6000 layout in the app and management system will be affected. Step 9 Choose Monitoring > Power Distribution, click the corresponding compensation cabinet, and set relevant parameters on the Running Parameters tab page.
Page 109
FusionPower6000 Maintenance Guide 7 FAQ Table 7-6 Operation methods for the scenario where Huawei AppGallery is not installed on the PAD Method Procedure Installation Verification Install the app from 1. Log in to Huawei Check that the app icon the Huawei...
For details about the edge data center management (EDCM) service, see the operation guide on the Huawei Cloud official website. NO TICE To use the EDCM service, you need to register a Huawei Cloud account and complete real-name authentication. Task...
Step 2 Choose Monitoring > Power Distribution, click the corresponding transformer, and set relevant parameters on the Running Parameters tab page. NO TE Ensure that Detail model is correctly set. Otherwise, the FusionPower6000 layout in the app and management system will be affected. ----End 7.9.2.2 Adding an ATS...
----End 7.9.4 Creating a FusionPower6000 Plan View To create a FusionPower6000 plan view, it is recommended that you obtain or draw the planned layout of the FusionPower6000 equipment room first. All devices are connected and added, and the communication is normal.
Click a device icon. On the Basic Configuration page, modify the value of Device Name and Device No.. Click Exit Edit Mode to create a FusionPower6000 plan view. NO TE If there are spaces without any devices deployed, use the placeholder icon in the cabinet list to fill in the view.