UPS5000-H-600 kVA-FTN
User Manual (Singapore, 100 kVA Power Modules)
Figure 5-1 Turning on a switch
After the UPS is powered on, initialization begins. The MDU displays the
initialization progress bar.
----End
5.1.2 Initial Startup
If the equipment is started for the first time, obtain authorization for the
equipment and set related parameters on the Settings Wizard screen. If the
equipment is not started for the first time, skip this section.
Procedure
Step 1 Obtain the startup password through the app. After the application is approved,
enter the password on the service authorization screen of the device to complete
device authorization.
Technical support engineers can obtain the service authorization code through the
app. For details, see the
Step 2 If the software version is incompatible, activate the software version as instructed
on the LCD.
Issue 02 (2023-11-07)
NO TE
Switches share one switch handle. Take out the handle when you operate different switches
and reinstall it after the operations are complete.
NO TICE
NO TICE
Copyright © Huawei Digital Power Technologies Co., Ltd.
Data Center Facility Deployment Guide .
5 Single UPS Commissioning
118