Huawei FusionPower6000 Maintenance Manual page 89

Hide thumbs Also See for FusionPower6000:
Table of Contents

Advertisement

FusionPower6000
Maintenance Guide
Procedure
Step 1 Obtain the service authorization code.
Figure 7-9 Obtaining the service authorization code
Step 2 Set the language, time and date, network parameters, system parameters, and
battery parameters on the Settings Wizard screen.
Set system parameters with caution. Incorrect setting may affect the normal UPS
operation.
● Set Single/Parallel after double check. Incorrect settings may affect the normal
● Output voltage level refers to the line voltage level. Set it based on site
● Set Output frequency correctly. Otherwise, loads may be affected and the UPS
● Set all battery parameters correctly based on site requirements. Battery
Issue 02 (2022-07-18)
NO TE
Change the password after your first login to prevent unauthorized access.
NO TICE
UPS operation.
requirements.
may not work properly.
parameter settings are critical to battery maintenance, battery lifespan, and
UPS discharge time.
Copyright © Huawei Digital Power Technologies Co., Ltd.
7 FAQ
82

Advertisement

Table of Contents
loading

Table of Contents