Commissioning A Ups; Powering On The Ups; Initial Startup - Huawei FusionPower6000 Maintenance Manual

Hide thumbs Also See for FusionPower6000:
Table of Contents

Advertisement

FusionPower6000
Maintenance Guide
Step 8 Turn on the feeder switches one by one and ensure that the voltage of the load
power input meets the requirements.
----End

7.7.2 Commissioning a UPS

7.7.2.1 Powering On the UPS

Context
Procedure
Step 1 For the UPS5000-H-1000 kVA, UPS5000-H-1200 kVA, and UPS5000-H-1600 kVA,
turn on SPD switches 1QFS and 2QFS.
Step 2 Perform impact tests on the UPS input switches.
1.
2.
3.
Step 3 Press the On button for the UPS input switch.
After the UPS is powered on, initialization begins. The MDU displays the
initialization progress bar.
----End

7.7.2.2 Initial Startup

● If the UPS is powered on for the first time, you need to obtain the startup
● The Service Expert app can be downloaded from HUAWEI AppGallery and can
Prerequisites
The Service Expert app has been installed and registered.
Issue 02 (2022-07-18)
Before power-on, ensure that the devices have passed all check items in the
section "Verifying the Installation."
Before power-on, ensure that all the UPS switches and upstream switches are
OFF.
Set the ACB to the TEST position and perform switch-on and switch-off
impact tests.
Set the ACB to the CONNECT position and perform switch-on and switch-off
impact tests.
After the testing is complete, ensure that the ACB is turned off.
NO TICE
password from the Service Expert app. Skip this step if the UPS is not powered
on for the first time.
only run on Android.
Copyright © Huawei Digital Power Technologies Co., Ltd.
7 FAQ
81