Running-In Instructions - Fayat Group BOMAG BW 900-50 Service Manual

Tandem
Table of Contents

Advertisement

Running-in instructions

008 921 86
3.4 Running-in instructions
The following maintenance work must be per-
formed when running in new machines or over-
hauled engines:
Caution
!
Up to approx. 250 operating hours check the en-
gine oil level twice every day.
Depending on the load the engine is subjected to,
the oil consumption will drop to the normal level
after approx. 100 to 250 operating hours.
Maintenance after 20 operating hours
Change engine oil and filter
l
Check the engine for leaks
l
Retighten the fastening screws on air filter, exhaust
l
and other attachments.
Check screw connections on the machine, retighten
l
as necessary.
BOMAG
3.4
33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents