Running-In Instructions - Fayat Group BOMAG BW177D-50 Operating Instructions, Maintenance Instructions

Single drum
Table of Contents

Advertisement

4-2012
MAINTENANCE

running-in instructions

The following maintenance work must be performed
when running in new machines or overhauled
engines:
up to approx� 250 operating hours check
the engine oil level twice every day�
depending on the load the engine is
subjected to, the oil consumption will
drop to the normal level after approx�
100 to 250 operating hours�
After a running-in time of 30 minutes
Retighten the V-belt
After 250 operating hours
Retighten bolted connections on intake and
exhaust tubes, oil sump and engine mounts.
Retighten the bolted connections on the
machine.
Retighten all wheel fastening screws with the
specified tightening torque.
Changing engine oil and oil filter
1. Oil change vibration bearings
Oil change in drive axle
Oil change in wheel hubs
After 500 operating hours
2. Oil change vibration bearings
Oil change drum drive gear (only DH and PDH
machines)
After 1000 operating hours
Ajusting the valve clearance
Section 5
5-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bomag bw177dh-50Bomag bw177pdh-50

Table of Contents