Chapter 2. For Building Managers; Home Screen - Mitsubishi Electric AE-200A Instruction Book

Air conditioning control system, centralized controller, integrated centralized control web
Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

Chapter 2. For building managers

When logged in with building manager privileges, all functions on the Integrated Centralized Control Web are available for use.

1. Home screen

Log into the AE-200 to display the Home screen. From here, it is possible to carry out monitoring, operation, and
start various functions.
Login URL: http://[IP address of the login destination centralized controller AE-200/EW-50]/control/index.html
Note: For how to log in to the Integrated Centralized Control Web using a PC or tablet, refer to 3 "Logging in to the Integrated
Centralized Control Web" in Chapter 1.
Note: Login processing may require approximately 1 minute. Also, switching between pages sometimes takes approximately
3 seconds. More time may be required, depending on your communications environment, terminal functionality, and the
number of devices in the managed air conditioning unit group.
[1] Menu
[6] Current date and time
[1] Menu
WT07996X02
[2] Monitor/Operation
Home
Displays a Home screen.
Displays a screen to monitor and operate the operation conditions of
Monitor/Operation
each unit group.
Energy Management
Displays the energy use status of each unit group.
Schedule
Sets the schedule operations for each unit group.
Displays error status that are occurring in a system.
Notice
Indicates the number of errors on the button.
Settings
Sets the settings such as screen display and user management.
Maintenance
Displays and sets the maintenance information of unit groups.
[5] Entire building
22
[3] This year's electric
energy consumption
[4] Notice

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aEw-50aAe-200eAe-50eEw-50e

Table of Contents