1-3-3. Annual Schedule

Schedules can be set for public holidays or summer vacation.
Up to five operation patterns (Pattern 1 to 5) can be set for the 24 months including the current month, and total of
50 days can be allocated to the patterns.
[1] Selecting a target to which the schedule will be applied
(1) In the group list, select a group icon(s) to which the schedule will be applied.
Refer to [1] in 1-3-2 "Weekly Schedule" for details.
[2] Selecting a schedule pattern
Up to five operation patterns can be set.
(1) In the Schedule settings screen (Month or Week display), click [Annual schedule pattern].
(2) In the pattern settings screen, select a schedule pattern to set the schedule.
(3) An Edit schedule settings screen will appear.
Schedule Setting (Month)
Annual schedule pattern
[3] Creating or changing the schedule contents
(1) In the Edit schedule settings screen, set the start time to apply to the schedule, set the operations to be
scheduled, and then click [OK].
Refer to [4] in 1-3-2 "Weekly Schedule" for details.
WT07996X02
Pattern settings
Pattern selection
Select a pattern to
set the schedule.
Display switching
Switches between
Month and Week.
143
Edit schedule settings (Pattern)
Schedule
contents
Simplified display
The simple schedule contents
Simplified display
for each pattern will appear.
The simple schedule
contents for each
Pattern to set the schedule
pattern will appear.