[2] Creating a schedule based on existing settings of other pattern/day of the week
When setting annual schedule patterns or setting schedules for each day of the week for weekly schedule, the
schedule settings can be created based on existing settings of other pattern or other day of the week.
(1) In the Edit schedule settings screen, click [Based on...].
(2) In the [Based on...] screen, select the pattern or the day of the week whose schedule is to be based on.
(3) The contents of the schedule that have been set for the selected pattern or the day of the week will appear
in the Edit schedule settings screen.
(4) Add or change the schedule contents, if necessary.
• Annual schedule
Edit schedule settings (pattern settings)
Pattern
to set the
schedule
Based on existing
settings of other pattern
• Weekly schedule
Edit schedule settings (weekly schedule settings)
Day of
the week
to set the
schedule
Based on existing settings
of other day of the week
WT07996X02
Pattern selection
Schedule contents
Pattern
The contents of the
Select the pattern
whose schedule is to be
based on.
selected pattern will
Day-of-the-week selection
Schedule contents
Day of the week
Select the day of the
week whose schedule is
to be based on.
77
Edit schedule settings (pattern settings)
schedule that have
been set for the
Add
Click to add the schedule
appear.
contents.
Edit schedule settings (weekly schedule settings)
The contents of the
schedule that have
been set for the
Add
selected day of the
Click to add the schedule
week will appear.
contents.
Edit
Click to edit the
schedule contents.
Edit
Click to edit the
schedule contents.