Schedule - Mitsubishi Electric AE-200A Instruction Book

Air conditioning control system
Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

3-3. Schedule

Weekly (5 types), annual (5 types), and current day scheduling are available. Schedules can be set for each group,
each floor, each block, or all groups.
Important
● When one or more AE-50 controllers are connected, the schedule settings must be made with the AE-50 properly connected
to ensure proper settings.
Schedule setting example
SUN
MON
TUE
3
4
5
3
10
11
12
10
17
18
19
17
24
25
26
31
24
31
Jan
Feb
Mar
Weekly
schedule 4
(winter)
Note: The figure above shows the setting example of weekly schedules where the date period for each Weekly Schedule is set to
the followings.
Weekly Schedule 1: Aug 1 - Aug 20
Weekly Schedule 2: Jun 16 - Sep 15
Weekly Schedule 3: Sep 16 - Nov 15
Weekly Schedule 4: Nov 16 - Mar 15
Weekly Schedule 5: Mar 16 - Jun 15
Note: When any of the Weekly Schedules 1, 2, 3, 4, and 5 overlap, the schedule with the lower number takes priority. For example,
Weekly Schedule 1 takes precedence over Weekly Schedule 2.
WT07190X01
Group 1
Aug
WED
THU
FRI
SAT
1
2
6
7
8
9
13
4
5
6
7
14
15
16
3
4
5
11
12
13
14
20
21
22
23
10
11
12
18
19
20
21
27
28
29
30
17
18
19
25
26
27
28
24
25
26
31
Apr
May
Weekly schedule 5
(spring)
Group 2
Aug
Group 3
FRI
SAT
Aug
1
2
FRI
SAT
1
2
8
9
6
7
8
9
15
16
13
14
15
16
22
23
20
21
22
23
29
30
27
28
29
30
Jun
Jul
Aug
Weekly
schedule 1
(special)
Weekly schedule 2
(summer)
36
Days that Weekly Schedule runs
Days that Annual Schedule runs
Days that Today's Schedule runs
Sep
Oct
Nov
schedule 4
Weekly schedule 3
(autumn)
Dec
Weekly
(winter)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aAe-50eAe-200eAe-50

Table of Contents