Bunn Fast Cup Series Service & Repair Manual page 83

Bean-to-cup single serve brewer
Table of Contents

Advertisement

RIGHT PANEL
High Voltage Board
Purpose: The H/V board receives and interprets
the input data it receives from the user touchscreen
assembly, resulting in a series of outputs to operate
components.
High Voltage Board
270VDC 48VDC
24VDC
Solid
R,C,L
Water
State
Grinder
Pump
Relay
Control
Brew
Motor
TEST INSTRUCTION
Enter Service Technician Mode and Select
Service icon
Step 1: Select and enter the Voltage/Current tab.
Step 2: You can view the H/V board internal volt-
ages and the protected output circuit volt-
ages.
Volt/Ohm Meter - Voltage Check
Step 3: Disconnect or unplug machine from power.
Step 4: Remove right panel to access circuit
boards.
Step 5: Locate J11 connector on the High Voltage
board.
Step 6: Connect power to machine.
Step 7: Enable main On/Off switch.
Step 8: Set voltmeter on D/C voltage. Install red
meter lead on terminal J11-1 WHI/RED
wire (positive) and black meter lead on
J11-4 WHI/BLK wire (negative) terminal.
The voltage reading should be 24.0VDC.
Step 9: Set voltmeter on D/C voltage. Install red
meter lead on terminal J11-2 RED wire
(positive) and black meter lead on J11-6
BLK wire (negative) terminal.
The voltage reading should be 48.0VDC.
PART RELATES TO THE FOLLOWING SYMPTOMS
No 24VDC - H/V Board LED's not illuminated
No 48VDC - H/V Board LED labeled 48V will not
be illuminated
SERVICE
16VDC
5VDC
3VDC
R,C,L
R,C,L
Door
Hopper
Temper-
Switch-
Detect
ature
es
Switch-
Sensors
es
Comm.
Brew
Motor
1
LED's
J11 Connector
8
&
9
83
1
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents