Bunn Fast Cup Series Service & Repair Manual page 48

Bean-to-cup single serve brewer
Table of Contents

Advertisement

LOWER FRONT PANEL
Piston Motor
Volt/Ohm Meter - Voltage Check
Step 1: Disconnect or unplug machine from power.
Step 2: Remove right panel to access circuit
boards.
Step 3: Locate J13 connector on the High Voltage
board.
Step 4: Connect power to machine.
Step 5: Set voltmeter on D/C voltage. Install red
meter lead on terminal J13-1 Violet wire
(positive) and black meter lead on J13-2
WHI/VIO wire (negative) terminal.
Step 6: The reading should be 48.0VDC with
both door switches turned On. The reading
will be 16.0VDC with one door switch
turned Off.
PART RELATES TO THE FOLLOWING SYMPTOMS
Motor making unusual noise during operation
Active Notice - E-098: Piston Error Comm Fail
Active Notice - E-071: Brew Error Piston Move
Timeout
SERVICE
208VAC 2 WIRE + GND
SINGLE PHASE
56640.0000A 08/19 ©2019 BUNN-O-MATIC CORPORATION
OPTIONAL
48
3
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents