Minelab F3 COMPACT Service Manual page 43

Metal mine detector
Hide thumbs Also See for F3 COMPACT:
Table of Contents

Advertisement

_______________________________________________________________________________________________________________________
Fit the cover shaft hinge to the shaft and screw into place. Figure 67.
Slide the coil into the end of the lower shaft. Fit the cap shaft then fit the two (2) screws
(14mm Nylon) as shown in Figure 68.
Thread the coil cable through the detector hinge and attach the shaft onto the detector
hinge.
Connect the coil connector (Figure 70) and close the detector body described in Section
3.2 - Closing the Detector
Figure 67: Fitting Pin Coil Cable and Cover Shaft Hinge
Figure 68: Connecting Coil to Lower Shaft
Figure 69: Connecting Shaft and Coil
Body.
Cap Shaft
43
F3 COMPACT Service Manual

Advertisement

Table of Contents
loading

Table of Contents