Probe/Connectors Check - GE Venue Fit Technical Publication

Table of Contents

Advertisement

P R E L I M I N A R Y
DIRECTION 5854713-100, REVISION 2
4-3-4

Probe/Connectors Check

NOTE:
Probes can be connected at any time, whether the unit is ON or OFF
CAUTION
Table 4-19 Probe and Connectors Checks
Step
Press Probe on the Operator Panel.
1
Select the desired probe.
2
Browse to the desired application.
Press Select to launch the application.
3
To change application without changing the current
probe, press Appl. on the Operator Panel.
Verify no missing channels.
4
Verify there's no EMI/RFI or artifacts specific to the
5
probe.
Check the probe in each active connector slot.
6
Do a leakage test on the probe.
7
Repeat this procedure for all available probes.
8
4-16
Take the following precautions with the probe cables:
Keep away from the wheels.
Do not bend.
Do not cross cables between probes.
Task
Chapter 4 - General Procedures and Functional Checks
VENUE FIT™ SERVICE MANUAL
Expected Result(s)
A list of the connected probes will pop
up on the screen.
An application menu for the desired
probe is listed on the screen.
The selected application starts.
All channels are functioning.
No EMI/RFI or artifacts.
It will display pictorial data each time.
It passes the test.

Advertisement

Table of Contents
loading

Table of Contents