Time and Manpower Requirements

Site preparation takes time. Begin site preparation checks as soon as possible, if possible, six weeks
before delivery, to allow enough time to make any changes.
FOR CONSOLE ULTRASOUND SYSTEMS AND FOR ULTRASOUND SYSTEMS
WARNING
WARNING
MOUNTED ON A DOCKING/ISOLATION CART, HAVE TWO PEOPLE AVAILABLE TO
DELIVER AND UNPACK THE ULTRASOUND SYSTEM.
CAUTION
2-6
Attempts to move the Ultrasound system considerable distances or on an inclive
by one person, could result in injury or damage or both.