Test Completion - GE Transport Pro Service Manual

Patient monitor
Hide thumbs Also See for Transport Pro:
Table of Contents

Advertisement

Test Completion

Revision A
Maintenance: Electrical Safety Tests
8. Read the current leakage indicated on DMM.
9. Set the polarity switch to RVS.
10. Read the current leakage indicated on DMM.
127(
If the reading is greater than the specification below, and the
device under test is powered from 100-240 V/50-60 Hz, the device
under test fails. Contact GE Medical Systems Information
Technologies Technical Support.
100 microamperes (0.1 volts on the DMM), and the device under
test is powered from 100-240 V/50-60 Hz
11. Set the power switch of the device under test to OFF.
1. Disconnect the leakage tester from the power outlet.
2. Disconnect all test equipment from the device.
3. Disconnect the device power cord from the leakage tester.
Transport Pro Patient Monitor
2012659-002
4-23

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Transport Pro and is the answer not in the manual?

Questions and answers

Table of Contents