Installing The Equipment: Base Stand (Optional); Assembling The Base And Main Units - Vatech Green 16 Installation Manual

Table of Contents

Advertisement

4. Installing the Equipment: Base Stand (Optional)

4.
Installing the Equipment: Base Stand
(Optional)
4.1

Assembling the Base and Main Units

1.
Remove the lower carrying handle.
Allen Wrench
2.
Put two wrench bolts into the holes on the bottom of the column unit.
Allen Wrench
Wrench Bolt
44
If the installation site is a concrete floor, go to section 4.4
Fixing the base (Optional) and do number 1 first; after that,
turn back 4.1 Assembling the Base and Main Units.
6 mm / 0.24"
6 mm / 0.24"
M8 x 45
- 2 pcs
(Part No. 24)
Green 16/18 Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Green 18Pht-65lhs

Table of Contents