Vatech Green 16 Installation Manual page 4

Table of Contents

Advertisement

Important Notes
Important Notes
vi
Moisture could be built upon the equipment from a sudden temperature
change inside and outside the installation room. Allow at least an hour
before turning ON the equipment to avoid condensation.
To avoid improperly balanced equipment, install the device on a
flat surface to maintain stability.
If the equipment is not stable, property damage and/or personal
injury may occur.
Do not push or pull the equipment.
Equipment should only be installed by an authorized technician,
complying with proper installation procedures
Failure to read and understand the information provided in the manual
may result in injuries or damages to the equipment. Please read each
CHAPTER in this manual and understand the information therein
before starting any of the installation procedures.
Green16/18 Installation Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Green 18Pht-65lhs

Table of Contents