2. Choosing an Installation Site
2.
Choosing an Installation Site
2.1
Room Requirements
<Without CEPH Unit (optional): 2,055 mm (L) x 2,495.8 mm (W) or wider >
12
The location of this equipment should allow for high
visibility of the patient by the operator, and the operator
should be as about the patient as possible.
This equipment should not be installed on thick carpets
for stability reasons.
Anti-static floor materials should be used around the
equipment.
The PC monitor, emergency cut-off switch, and X-ray
Exposure Switch should be installed in the vicinity of
the operator so that he or she can manage them
simultaneously in case of emergency.
Green 16/18 Installation Manual