Vatech Green 16 Installation Manual page 55

Table of Contents

Advertisement

6.
Put the equipment in a vertical position slowly while holding the upper handle.
7.
Tighten the three wrench bolts to attach the base unit.
Allen Wrench
Wrench Bolt
Green 16/18 Installation Manual
4. Installing the Equipment: Base Stand (Optional)
Be sure not to damage the cables. Before erecting the
equipment, keep them clear of the equipment.
8 mm / 0.31"
M10 x 25
- 3 pcs
(Part No. 23)
47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Green 18Pht-65lhs

Table of Contents