Vatech Green 16 Installation Manual page 53

Table of Contents

Advertisement

3.
Put the base unit to the column unit by engaging the base holes in the
bolts, as shown in the figure.
Green 16/18 Installation Manual
4. Installing the Equipment: Base Stand (Optional)
Put the bolts into the holes until about 30 mm are left
outside.
Hold the base unit to keep it from falling.
If you do not use the base during the assembly, remove
2 pcs of Truss bolts while installing the front cover as
below.
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Green 18Pht-65lhs

Table of Contents