Put the Equipment on the aligning plate while making sure that the column bottom
holes engage in the anchored bolts.
4.
Put the washers and nuts into the six anchored bolts on the floor and tighten the
nuts loosely. Make sure that you put the fasteners in the sequence, as shown in
the figure.
Green 16/18 Installation Manual
5. Installing the Equipment: Wall Mount
Do not tighten the nuts until the leveling is completed.
When you are tightening the nuts, another person must
hold the middle handle to prevent the equipment from
falling.