4 Installing the Equipment: Floor Standing (Optional)

4.1 Assembling the Base and Main Units

Unloading the main unit
48
If∙the∙installation∙site∙is∙a∙concrete∙floor,∙go∙to∙section∙4.3∙Fixing∙the∙base∙
(Optional)∙and∙do∙number∙1∙first,∙after∙that∙turn∙back∙4.1∙Assembling∙the∙
Base and Main Units.
Place∙some∙protective∙stuff∙on∙the∙floor∙to∙avoid∙the∙scratches∙on∙the∙
surface
One installer should keep on holding the vertical frame area to keep the
equipment stable after it is unloaded.
1. First, unload the main unit on the floor.
PaX-i (PCH-2500) Installation Manual
Hold vertical
frame area